Autech Platform
The whole plant operation in one place.
Production, orders, stops, quality, lots and alerts share the same data model. Below, a complete demo shift: walk through its sections.
See the platform in a demoProduction
OP-24117 · Shift A · as of 10:28
- FormerRunning98 /min
- BreaderRunning4.2 m/min
- FryerDiverting to carts182 °C
- Freezing tunnelStopped · 10:16 · 12 min−12.1 °C
- PackingNo product0 /min
Output against target by hour
2,242of 2,948 boxes · target so far76%
Produced10:00–10:28Target 660/h
Shift OEE
74.4%A × R × Q
- Availability
- 83.6%
- Performance
- 91.0%
- Quality
- 97.8%
Planned time
- Good 74.4%
- Stops 16.4%
- Speed 7.5%
- Scrap 1.7%
Camera C-01 · packing exit
2,242 boxes · shift countBelt not moving since 10:16
Active order
OP-24117Running
Breaded chicken nuggets · 1 kg box
- Produced
- 2,242
- Plan
- 4,800
- Good
- 2,193
- Scrap
- 49
Lot L-2311 · Pallet being built T-0412 on hold
Stopped minutes by cause
- Conveyor jam2 stops20 min45%
- Tunnel out of temperature1 stop · ongoing12 min73%
- Breader adjustment1 stop7 min89%
- Raw material shortage1 stop5 min100%
Alerts
- 10:20QualityProduct temperature out of rangeLot L-2311 · −11.8 °C (limit −18 °C) · pallet T-0412 on holdUnacknowledged
- 10:16StopFreezing tunnel out of temperatureLine 2 stopped · tunnel exit at −12 °CIn progress
- 09:21StopRaw material shortageFormer out of chickenClosed
Line 2 · Breaded
Demo plant · Shift A · 10:28
Production
Line status
- Former: Running
- Breader: Running
- Fryer: Diverting to carts
- Freezing tunnel: Stopped
- Packing: No product
Freezing tunnel · stopped since 10:16 · 12 min
Produced · boxes
2,242of 2,948 against target so far
76% · Target 660/h
- 10:16StopFreezing tunnel out of temperatureLine 2 stopped · tunnel exit at −12 °CTo: Maintenance, Production · acknowledged 10:18 · P-0455In progress
Active order
OP-24117Running
Breaded chicken nuggets · 1 kg box
- Produced
- 2,242
- Plan
- 4,800
Lot L-2311 · Pallet being built T-0412 on hold
One stop, the 10:16 freezing-tunnel stop, seen in production, quality and alerts. Use the menu on the left to walk through the shift.One stop, the 10:16 freezing-tunnel stop, seen in production, quality and alerts. Use the tabs at the bottom to walk through the shift.
Illustrative simulation — not production data.
One record, three places
Follow the 10:16 stop: freezing tunnel out of temperature. It's the same record in every view, not three copies someone has to reconcile at shift end.
- 10:20QualityProduct temperature out of rangeLot L-2311 · −11.8 °C (limit −18 °C) · pallet T-0412 on holdTo: Quality, ProductionUnacknowledged
- 10:16StopFreezing tunnel out of temperatureLine 2 stopped · tunnel exit at −12 °CTo: Maintenance, Production · acknowledged 10:18 · P-0455In progress
- Produced
- 2,242
- Target so far
- 2,948
- OEE
- 74.4%
- Stopped time
- 44 min
Stops
| Start | Duration | Cause | Owner | Status |
|---|---|---|---|---|
| 10:16 | 12 min | Freezing tunnel out of temperature | Maintenance | ongoing |
| 09:21 | 5 min | Raw material shortage | Warehouse | Closed |
| 08:40 | 6 min | Conveyor jam | Maintenance | Closed |
Demo data · Line 2 · Breaded · Shift A · Illustrative simulation — not production data.
Twelve capabilities, one database
Not twelve programs to wire together. They're parts of the same platform: switch on what you need today and add others when they make sense.
Production
- Production monitoringActual output against target by line and by hour.In the app: Production
- Production ordersActive order, product and standard linked to each line.In the app: Orders
- DowntimeEvery stop with time, duration, cause and owner.In the app: Stops
- OEE and performanceAvailability, performance and quality you can explain.In the app: Production
Quality and records
Management
Connectivity and intelligence
- ERP integrationIn phases: read orders first, post finished goods later. For example, Microsoft Dynamics.In the app: Orders
- Operational intelligenceQuestions about operations answered in the context of your own data.Across every view
Where we're heading
From camera to decision
The platform is the centre of a system that starts on the line and ends with the people who decide.
Autech Platform
One data model for production, orders, stops, quality, lots and records. This is where camera, forms and existing systems meet.
- Where it lives
- Hosting defined with your IT team during technical design.
- Who provides it
- Autech software: usage licence, per-plant configuration and support.
Lives alongside what you have
Autech doesn't replace your ERP. The integration, in development, starts by reading orders, products and standards; posting finished goods and consumption comes later. It's defined in phases with your IT team.
In development
See solution: Industrial integrations →Operational intelligence
With production, stops, quality and lots in one place, you can ask “why did line 1 slow down on Tuesday?” and get an explanation grounded in your data. It's where we're heading: it builds on the information the platform already records.
Where we're heading
Let's start with one problem.
Tell us what's costing you most today. We review it with you, show how we'd solve it and estimate its value together.